Equipment rollouts for new menu items require planning that begins well before the item reaches the plate, according to Bryan Musgrove, divisional senior director on national accounts for TriMark USA. Musgrove, who has worked on many such rollouts, outlined practices aimed at making deployments across locations more seamless.
Map each location before ordering
Operators should create a playbook that distinguishes locations that can accommodate new equipment immediately from those that need support, Musgrove said. TriMark worked with a brand adding toasted sandwiches to a breakfast lineup of biscuits and wraps. The new toasters created site-specific constraints: some locations already had maxed-out electrical capacity, while small mall or urban units lacked counter space. In those cases, creating room for a toaster by adding shelving or an extra table can affect workflow, he noted.
Build the timeline from lead times
The schedule should be driven by how quickly the manufacturer can deliver, not by the desired launch date alone. Musgrove described a scenario in which a manufacturer can produce 200 units but only 10 per week, making the full order a 20-week job. In another case, a supplier might have inventory for the first 50 units, then need eight weeks to obtain overseas parts before completing the rest. For a menu item tied to a seasonal or occasion-based marketing campaign, Musgrove said operators should work backward from the launch date to set an achievable timeline.
Consolidate deliveries by location
Packaging can also be reworked to simplify deliveries. Rather than shipping smaller wares directly to each location in original boxes, operators can ask their dealer to consolidate and repackage items into one package per location. TriMark worked with a brand adding macaroni and cheese to its sides lineup; the rollout required visual holding cabinets, pans and serving scoops in varying sizes. The items were combined into one package per site, with instructional materials and exterior labeling so managers knew what had arrived.
Musgrove said following these practices—from identifying sites that need more support to simplifying deliveries—can help ensure a smooth rollout. If the plan works, the new menu item can generate buzz and increase traffic.